Document Type

Conference Paper

Rights

Available under a Creative Commons Attribution Non-Commercial Share Alike 4.0 International Licence

Disciplines

Civil engineering, Environmental and geological engineering, Energy and fuels

Publication Details

2019 - Proceedings of the Institution of Civil Engineers - Energy

Abstract

The techno-economic parameters that influence the commercial deployment of hybrid thermophotovoltaic (TPV) solar power generation are determined using annual system simulations. It has been found that a TPV cell price of E5/cm2 or less together with a TPV operating temperature under 800°C is required for a hybrid solar–biomass TPV power plant to be economically competitive with the state-of-the-art hybrid solar–biomass Rankine cycle power plants.

DOI

https://doi.org/10.1680/JENER.19.00023

Funder

Technological University Dublin


Share

COinS